Labor and Project Reports combine completed work, overtime categories, approved leave, effective-dated employee cost rates, project billable rates, and calculated gross margin.
Required access: Report-view permission. Pay-rate changes require the corresponding management permission. Enable Labor and Profitability Reports and the relevant sub-features.
Enable reporting
- Go to Time Logger > Settings > Features.
- Enable Labor and profitability reports.
- Expand it and enable Employee Labor Reports, Project Profitability, Pay-Rate Management, and Report Exports as needed.
- For project billable value, also enable Projects & Cost Codes and Billable Rates.
- For leave rows, enable Time Off and Payroll Leave Rows.
- Select Save feature controls.
Set an employee cost rate
- Go to Time Logger > Payroll > Reports.
- Find Employee Cost Rate.
- Select the Employee.
- Enter the Effective Date.
- Enter Hourly Cost as a number in the configured currency.
- Enter an optional internal note explaining the rate source or change.
- Select Save effective rate.
- Run a report covering the effective date and confirm the calculation.
Rates are effective-dated. A new rate applies from its effective date forward and does not rewrite the cost assigned to earlier work. Enter a new rate record when compensation changes.
Choose what Hourly Cost represents
Use one consistent internal definition. It may represent base wage only or a fully burdened labor cost that includes employer expenses. The plugin multiplies the saved value by categorized hours; it does not calculate taxes, benefits, insurance, or overhead on its own. Document the organization's chosen method.
Configure report policy
- Enter the three-letter ISO Currency Code, such as USD, CAD, or GBP.
- Enter the Overtime Cost Multiplier, such as 1.5 when appropriate.
- Enter the Double-Time Cost Multiplier, such as 2.0 when appropriate.
- Select Save report policy.
The currency code labels values; it does not perform exchange-rate conversion.
Configure project billable rates
- Go to Time Logger > Payroll > Projects.
- Create or edit an Active project.
- Enter the Billable Hourly Rate.
- Confirm employees select that project when recording time.
- Run a report that includes known project time and verify billable value.
Run a labor report
- Go to Time Logger > Payroll > Reports.
- Enter the Report Start Date and End Date.
- Select Run report.
- Review summary totals first.
- Review Employee Breakdown for regular, overtime, double-time, worked hours, paid leave, unpaid leave, and labor cost.
- Review Project Profitability for hours, labor cost, billable value, and gross margin.
- Investigate missing rates, unassigned projects, or unexpected overtime before exporting.
Calculation reference
| Value | How it is determined |
|---|---|
| Worked minutes | Completed time after applicable break and lunch treatment. |
| Regular / overtime / double time | Active payroll rules and workweek boundaries categorize eligible time. |
| Labor cost | Employee rate effective on the work date multiplied by categorized hours and applicable cost multipliers. |
| Billable value | Project hours multiplied by the project's billable hourly rate. |
| Gross margin | Billable value minus calculated labor cost. |
| Leave | Approved requests included when the related Time Off sub-feature is enabled. |
Example
An employee records 8 project hours at a $30.00 hourly cost. The project's billable rate is $100.00. With no overtime, labor cost is $240.00, billable value is $800.00, and gross margin is $560.00. This is a management estimate; it does not automatically include taxes, benefits, materials, or other project expenses.
Export report results
- Run the exact date range needed.
- Review and resolve missing data.
- Select Export report CSV.
- Open the file and compare it with the on-screen summary.
- Store the file according to the organization's payroll and privacy policy.
The report CSV is an analysis export. It is different from provider-ready payroll files created under Payroll > Pay Periods.
Troubleshooting
| Problem | Resolution |
|---|---|
| Reports tab is missing | Enable the reports master feature and confirm report permission. |
| Labor cost is zero | Add an employee rate effective on or before the work date and rerun the report. |
| Project profitability is empty | Enable projects, project reporting, and billable rates; confirm entries have a project. |
| Billable value is zero | Add a billable rate to the project and confirm the entry references it. |
| Historical cost changed unexpectedly | Check whether a prior effective-dated rate was edited or replaced instead of adding a new dated rate. |
| Report and payroll export differ | Confirm date range versus pay-period boundaries, leave inclusion, export format, and project columns. |
Privacy notice: Employee rates, labor cost, and margin are sensitive. Grant report and settings access only to authorized people and protect exported files.